MZT- Macro-Z-Technology
  • HOME
    • OUR PRESIDENT
    • SAFETY & QUALITY CONTROL
  • SERVICES
    • FEDERAL CONTRACTS
    • STATE CONTRACTS
    • SPECIALTY CONCRETE
    • PUBLIC WORKS
    • DESIGN BUILD
    • HISTORICAL RENOVATION
    • ENVIRONMENTAL REMEDIATION
    • SOLAR PHOTO VOLTAIC
  • PROJECTS
  • ESTIMATING
  • CAREERS
  • CONTACT US

Design Build 14" Waterline, Edwards Air Force Base, CA

This project was a design build task order for the Navy at Edwards AFB, Ca.  The project included the design and construction of approximately 20,000 lineal feet of 14-inch Ductile Iron Cement Mortar Lined and Coated pipe, Ductile Iron fittings, Butterfly Valves, Utility Vaults, thrust blocks, removal and replacement of asphalt pavement, irrigation and landscaping. The new waterline tied into an existing pump station that pumped water to an elevation 600’ above the pump house.  ​
Corporate Office - 841 E. Washington Ave. Santa Ana, CA 92701
Tel: 
(714) 564-1130  Fax: (714) 564-1144
License: 561313
Copyright © 2020 Macro Z Technology. All rights reserved.
  • HOME
    • OUR PRESIDENT
    • SAFETY & QUALITY CONTROL
  • SERVICES
    • FEDERAL CONTRACTS
    • STATE CONTRACTS
    • SPECIALTY CONCRETE
    • PUBLIC WORKS
    • DESIGN BUILD
    • HISTORICAL RENOVATION
    • ENVIRONMENTAL REMEDIATION
    • SOLAR PHOTO VOLTAIC
  • PROJECTS
  • ESTIMATING
  • CAREERS
  • CONTACT US