Design Build Services for International Arrivals Facility, Seattle, WA
This “progressive” design-build fast-track project prepared SEATAC airport for the upcoming demolition of the existing SEATAC facilities and construction of the new International Terminal. MZT was brought on board prior to the 35% design of the new terminal to work with the design-build designer, Skidmore, Owings & Merrell LLP (SOM) for the accomplishment of the refurbishment and improvements to 4 separate areas within the existing buildings at SEATAC Airport. These areas were to receive improvements such that the functions displaced by the demolition work in preparation for the construction of the new International Terminal. These areas totaled 31,600SF.
In addition to the renovation and improvements of the existing areas, MZT was also tasked with completion of the new Cruise Line Bus parking, loading and turnaround at SEATAC to serve the new cruise ships that are docking in Seattle. This 62,000SF area included entrance and exit, parking lot, turnaround, landscape, lighting, drainage, etc. MZT performed the demolition work of the existing parking lot and surrounding areas as the design was started. We began the construction of the new facility at the 35% design. |
|