MZT- Macro-Z-Technology
  • HOME
    • AWARDS
    • OUR CLIENTS
    • ABOUT OUR PRESIDENT
    • SAFETY & QUALITY CONTROL
  • SERVICES
    • FEDERAL CONTRACTS
    • STATE CONTRACTS
    • SPECIALTY CONCRETE
    • PUBLIC WORKS
    • DESIGN BUILD
    • HISTORICAL RENOVATION
    • ENVIRONMENTAL REMEDIATION
    • SOLAR PHOTO VOLTAIC
  • PROJECTS
  • ESTIMATING
  • CAREERS
  • CONTACT US

Deer Creek Wastewater Treatment Plant, CA

This project for the Corps of Engineers included upgrades to the Wastewater Treatment plant and construction of an Equalization Pipeline at Placerville, Ca.  The project included a 2.6 million gallon equalization storage tank, a new equalization pump station with three (3) motorized sluice gates, three (3) vertical submersible pumps with valves, connection to the pipeline, and flow meter and an emergency generator.  MZT also installed 1,400 LF of 20-inch waterline, including unclassified excavation, backfill, compaction, marking tape, and groundwater control. 
Corporate Office - 841 E. Washington Ave. Santa Ana, CA 92701
Tel: 
(714) 564-1130  Fax: (714) 564-1144
License: 561313
Copyright © 2019 Macro Z Technology. All rights reserved.
  • HOME
    • AWARDS
    • OUR CLIENTS
    • ABOUT OUR PRESIDENT
    • SAFETY & QUALITY CONTROL
  • SERVICES
    • FEDERAL CONTRACTS
    • STATE CONTRACTS
    • SPECIALTY CONCRETE
    • PUBLIC WORKS
    • DESIGN BUILD
    • HISTORICAL RENOVATION
    • ENVIRONMENTAL REMEDIATION
    • SOLAR PHOTO VOLTAIC
  • PROJECTS
  • ESTIMATING
  • CAREERS
  • CONTACT US